Cut-offs π
Dataflow monitoring can be enabled by defining cut-off rules ensuring that data is in the right place at the right time.
The cut-off function monitors if dataflows are completed within a pre-defined time frame. It is available exclusively for modeled flows. Cut-offs can be set both at dataflow and node level. Head over to this page for details on how to create a cut-off.
You can set Cut-offs either at dataflow level or at node level, but not both! Be aware that you can save Cut-offs at both levels at the same time in DRAFT version dataflows. However, the DRAFTS will not be promoted to MASTER with these settings.
Within Data Watcher, 2 different cut-offs can be configured:
Duration cut-off: the file must reach a specific status by the end of the time interval. For example, within 2 hours after the beginning of the flow.
Planned cut-off: the file must reach a specific status within the scheduled time frame. For example, by 10 am.
For each cut-off, a warning message or error message notification can be configured to inform the configured list of recipients that the flow is lasting longer than expected. Learn how to set notifications here.
Last updated