Cut-off calendars π
PAGINA PRONTA PER PR-3038. RIMUOVERE LA PAGINA CUT-OFFS > CUT-OFF CALENDARS PERCHE' CON IL PR-3038 LA NUOVA POSIZIONE E' IN SETUP. PER COMPLETEZZA, LA PAGINA CUT-OFFS DEVE SPECIFICARE CHE I CUT-OFF CALENDARS SI CONFIGURANO IN SETUP, CON LINK A QUESTA PAGINA.
If you want to know why you need to set up a Cut-off calendar, follow this link.
Data Watcher has two pre-existing calendars: Everyday and Every Working Day. To set a different calendar, you can download the Every Day Model, modify it on your local drive, and upload it.
If you need to set a different Calendar, follow these steps:
As Administrator, go to Setup β Cut-off Calendars.
Click on the 3 dots icon on the right of the Every Day Model and select Download to save it on your local drive.
Edit the TXT file noting that: [INFO] Name: name of the cut-off calendar that will appear on the Name column of the result list. Description: description that will appear on the Description column of the result list. [WEEKDAYS] Accepted values: E for enabled or D for disabled. A day is Enabled when a cut-off can be configured for that day. A day is Disabled when a cut-off cannot be configured for that day. [EXCEPTIONS] In this section you can configure bank holidays or days when the cut-off will not be applied. The format supported is: yyyymmdd=E | D For example: 20251225=D will disable December 25th, 2025.
In the Cut-off Calendars page, click the UPLOAD button to import the file into Data Watcher.
If you need to edit the file, use the Update option of the 3 dots icon.
Find here below an example of a Calendar:
Example of a Cut-off Calendar
[INFO]
NAME=Every Working Day
DESCRIPTION=Every Working Day
[WEEKDAYS]
MONDAY=E
TUESDAY=E
WEDNESDAY=E
THURSDAY=E
FRIDAY=E
SATURDAY=D
SUNDAY=D
[EXCEPTIONS]
20241225=D,Christmas
20250815=D,Bank Holiday
20251225=D,Christmas
Once you have uploaded your Calendar, it will appear in the result list. From the result list, you can view, update, download, or delete each Cut-Off Calendar listed.
Last updated